LUNA2000-(5-30)-S0
User Manual
Figure 5-9 Crimping an OT terminal
(A) Core wire
(D) Heat gun
Step 2 Connect the ground point of the power control module to the external ground
point.
Figure 5-10 Grounding the PE cable
Issue 07 (2022-01-10)
(B) Insulation layer
(E) Hydraulic pliers
Copyright © Huawei Technologies Co., Ltd.
5 Electrical Connection
(C) Heat shrink tubing
72