Download Print this page

Sealey LP35 Instructions page 2

Propane heaters

Advertisement

2. TECHNICAL SPECIFICATIONS
Model:
Output (Propane):
Output (EN1596):
Output (Propane):
Output (EN1596):
Air Flow:
Fuel Consumption:
Electrical Input:
Length:
Width:
Height:
Fuel:
Heated Volume:
Model:
Output (Propane):
Output (EN1596):
Output (Propane):
42,000 - 106,400Btu/h
Output (EN1596):
51,000 - 131,793Btu/h
Air Flow:
Fuel Consumption:
Electrical Input:
110/230V - 1.5/0.72A
Length:
Width:
Height:
Fuel:
Heated Volume:
3.
INSTALLATION
Note: If you use a small gas cylinder the heater may not operate at its maximum
efficiency. We recommend the use of two or more cylinders linked in parallel to achieve
maximum continuous efficiency (fig 1).
3.1. Setting heater supply voltage. (LP100, LP145, LP200 & LP300 only)
3.1.1. Locate the supply voltage selector panel (fig 2), on the side of the base.
3.1.2. If the correct supply voltage is NOT shown, remove the two securing screws.
3.1.3. Remove the cover panel and select the required switch position as shown in fig.3.
Note: The moulded design of the cover panel ensures that the selected voltage is visible.
3.1.4. Refit the cover panel using the two securing screws.
3.2. Connections
3.2.1. Check heater and gas cylinders to ensure they are in good order and condition. If not stop and contact your supplier immediately.
3.2.2. Site the heater and gas cylinders in the operational area.
3.2.3. Connect heater to an electric socket ensuring that the machine is correctly earthed. See safety instructions.
3.2.4. Connect the gas supply hose to the pressure regulator and connect the regulator to the gas cylinder.
3.2.5. Gradually open the tap of the gas cylinder. Check hose and fittings for gas leaks.
F
WARNING! DO NOT USE A NAKED FLAME! To check for leaks, we recommend the use of a foamy soap.
fig 2.
4.
IGNITION
IMPORTANT: To ensure continuous ventilation to the heater area, a ventilation opening must run to the outside of the premises where heater
is to operate.The opening must be 25cm
4.1
Switch Heater On.
4.1.1. Turn the fan switch to position “I” and check that the fan starts running (fig 4).
4.1.2. Push the gas valve button in and hold, then press repeatedly on the ignition lighter switch until the flame ignites (fig 5).
4.1.3. As flame lights, and the heater starts, keep the gas valve button pushed in for about 10 seconds (fig 6).
4.1.4. If the heater stops when the gas valve button is released, leave the fan on but wait for one minute and repeat at the starting operation
steps 4.1 to 4.3. after which hold the gas valve in for longer than 10 seconds before releasing (fig 7).
4.1.5. Desired heat output is controlled by regulating the gas flow pressure. Turn regulator anticlockwise to reduce the pressure and heat,
and clockwise to increase the pressure and heat.
4.2.
Switch Heater Off.
4.2.1. Shut off the gas cylinder tap. Allow the fan to continue running until the flame shuts down, then turn the fan switch to position “O”.
LP35
10kW
10.8kW
35,000Btu/h
36,880Btu/h
300m³/h
0.8kg/h
230V - 0.3A
390mm
180mm
270mm
Propane
8,750ft³
LP100
12.5 - 31.2kW
26.6 - 43.5kW
15 - 39kW
33.24 - 54.53kW
90,000 - 148,500Btu/h
113,000 - 186,000Btu/h
750m³/h
1.0 - 2.46kg/h
2.09 - 3.41kg/h
110/230V - 1.5/0.72A
530mm
280mm
400mm
Propane
26,000ft³
230
for every kW, and must be set at an equal distance from upper and lower parts of heater operating area.
2
LP45
12kW
14.6kW
43,018Btu/h
49,487Btu/h
350m³/h
0.8kg/h
230V - 0.5A
450mm
220mm
355mm
Propane
11,000ft³
LP145
119,000 - 200,000Btu/h
148,000 - 263,000Btu/h
850m³/h
110/230V - 1.3/0.65A
690mm
280mm
400mm
Propane
37,000ft³
fig 3.
LP35, LP45, LP60, LP80X, LP100, LP145, LP200, & LP300. - 3 -300402
LP60
15kW
16.2kW
52,000Btu/h
45,853 - 86,721Btu/h
55,320Btu/h
50,667 - 93,822Btu/h
300m³/h
1.17kg/h
230V - 0.3A
490mm
220mm
285mm
Propane
15,000ft³
LP200
34.9 - 58.5kW
43.41 - 77kW
171,000 - 280,500Btu/h
234,000 - 348,900Btu/h
1800m³/h
2.8 - 4.64kg/h
110/230V - 1.3/0.65A
780mm
370mm
520mm
Propane
50,000ft³
fig 1.
110V
230V
LP80X
13.4 - 25.4kW
14.8 - 27.5kW
560m³/h
1.0 -1.8kg/h
230V - 1.5A
500mm
280mm
410mm
Propane
20,000ft³
LP300
50.1 - 82.2kW
68.4 - 102.2kW
2450m³/h
3.9 - 6.5kg/h
925mm
370mm
520mm
Propane
70,000ft³

Advertisement

loading

This manual is also suitable for:

Lp45Lp60Lp80xLp100Lp145Lp200 ... Show all