• The server supports the following power supply configurations:
– For two processor server configurations, one or more 1600-watt or 1100-watt power supplies.
– For four processor server configurations, two or more 1600-watt or 1100-watt power supplies.
– For eight processor server configurations, two or more 1600-watt or four 1100-watt power supplies
Attempting to operate the server with an unsupported power configuration results in an "unsupported
configuration" message in the system event log and on the system front panel
• Power supplies can be installed in any power supply bay and populated in any order. Redundancy differs
depending on how many processors are installed, the number of power supplies that are required to keep
the system operating, which power supply bays are populated, and the number of input power sources.
Notes:
– For power source redundancy, the power supplies in bays 1 and 3 must be fed from a different power
source than the power supplies in bays 2 and 4.
– Use the Lenovo Capacity Planner to calculate the required power capacity for what is configured for
your server. More information about the Lenovo Capacity Planner is available at:
datacentersupport.lenovo.com/solutions/lnvo-lcp
Before you install a power supply:
1. If the power supply bay contains a filler, pull the filler from the bay.
Complete the following steps to install a power supply:
Watch the procedure. A video of the installation process is available:
YouTube
Youku
Step 1.
Install the power supply in the bay.
Figure 51. Power supply installation
Insert the power supply in its bay and press it in until the release tab locks.
After you have installed a power supply:
1. If the power supplies being installed are of a different wattage than the power supplies previously
installed in the chassis, cover the existing chassis power rating label with a new label of the same style
from the system power rating labels sheet that comes with the power supply option.
2. Route the power cable from the power supply to the power source and secure it.