Download Print this page
Smeg TR90 Series Connection Manual

Smeg TR90 Series Connection Manual

Delivery & connection guide
Hide thumbs Also See for TR90 Series:

Advertisement

Quick Links

SMEG COOKERS
Delivery & Connection Guide
Disposal and installation is not available online for this product. Instead, call 0345 604 8835 to order over the phone and
arrange these services.
Smeg will provide a 'hook up' service to connect your new cooker to both the natural gas and/or electrical supply (please
note Smeg will not undertake disconnection or connection to LPG). This connection service is provided on the understanding
that existing fuel supplies have been prepared to a required standard and fall within the parameters laid out in the following
information.
Once your order has been processed our fulfilment partner will get in touch with you to arrange a home delivery booking.
When a date is agreed they will also give you a follow up call the day before delivery with a 4hr delivery window. You
can also choose to be contacted one hour prior to delivery on the actual day, should you wish.
To ensure everything runs smoothly, when making the booking our fulfilment partner will carry out a home delivery
questionnaire to ascertain information relating to both access at your property & the electrical/gas supply.
DISCONNECTION: Please note our team can only disconnect gas from a standard bayonet fitting. Please ensure any
cooker for removal is cooled down prior to the team arriving.
GAS CONNECTION: Your cooker will be supplied with a one metre long mark 2 BS bayonet hose with a 1/2" BSP male
fitting, which will be used to connect your cooker to the gas supply.
ELECTRICAL CONNECTION: Your electrical supply must be easy to access. If it's inaccessible or the supply is faulty, we
wont be able to complete your connection. Your cooker will be supplied with the appropriate cable to connect to the
electrical supply. Please visit
www.smeguk.com
for information on the electrical loading requirement for your appliance.
Every home is different, so please ensure the electrical loading supply is suitable for the appliance you are purchasing. We
recommend you seek confirmation of this via the services of a qualified electrican. If you need help finding an electrican
please visit www.electricalsafetyfirst.org.uk/find-an-electrician/.
The instruction manual for your new appliance is available to view or download on our website
www.smeguk.com/user-
manuals
which contains detailed information regarding installation.
Cookers delivery and connection guide page 1/3

Advertisement

loading

Summary of Contents for Smeg TR90 Series

  • Page 1 Smeg will provide a ‘hook up’ service to connect your new cooker to both the natural gas and/or electrical supply (please note Smeg will not undertake disconnection or connection to LPG). This connection service is provided on the understanding that existing fuel supplies have been prepared to a required standard and fall within the parameters laid out in the following information.
  • Page 2 MODELS: CC92/SUK61/SUK62/SUK91/SUK92/SY62/SY6/SY92/C7GPX/ TR90*/TR62/CPF9GP/CPF9IP/A1/A2/A3/A4/A5 The gas bayonet fi tting must terminate to the left hand side of the cooker when viewed from the rear and must be within 100mm from the edge of left hand side, it must not be directly behind the appliance. The bayonet fi tting must be no higher than 700mm and no lower than 600mm from the fl oor.
  • Page 3 HOT ZONE The hot zone is the area directly above your cooker. Before connection please ensure that this area is free from fl ammable items including wood, wallpaper, plug sockets, wiring or an overhanging boiler. If the hot zone isn’t clear, we may not be able to complete your connection.

This manual is also suitable for:

Cc92Suk61Suk91Suk92Sy62Sy6 ... Show all