Installing the Hanging Bracket Kit

All HZ units come with hanging bracket installation
kit to facilitate suspended unit mounting using
threaded rod. Hanging brackets are to be installed
as shown in Fig. 6.
Fig. 6 Hanging Brackets Locations
This kit includes the following:
(5) Brackets
(5) Rubber Vibration Isolators
(8) Screws: #10 x 1/2
(10) Bolts: 1/4–28 x 1/2" Hex bolt (Note: Not
needed for this series.)
The following are needed and are to be field
provided:
Threaded rod (3/8" max. dia.)
Washers (1-3/4" min. O.D.)
Hex nuts
WARNING: Follow all applicable codes and
requirements when hanging this unit and
selecting the threaded rod material, etc.
1. Remove and discard factory provided screws
from locations where hanging brackets will be
installed as shown in Fig. 7.
QV Series Heat Pumps
Fig. 7
2. Mount the four brackets to unit corner post
using the bolts provided in the kit as shown in
Fig. 8.
WARNING: Do NOT reuse screws removed
from the unit in Step #1 to mount the
hanging brackets to the unit.
Fig. 8
3. Install rubber grommet onto the brackets as
shown in Fig. 9.
4. Hang the unit and assemble the field-provided
threaded rod, nuts, and washers on to the
brackets as shown in Fig. 9.
DANGER: The rods must be securely
anchored to the ceiling.
Subject to change without prior notice
Horizontal (HZ) Units | 11