General

Introduction

Testing Philosophy

GE Multilin

7 Commissioning

General
The procedures contained in this section can be used to verify the correct operation
of the 745 Transformer Management Relay prior to placing it into service for the first
time. These procedures may also be used to verify the relay on a periodic basis.
Although not a total functional verification, the tests in this chapter verify the major
operating points of all features of the relays. Before commissioning the relay, users
should read Chapter 3: Installation, which provides important information about
wiring, mounting, and safety concerns. The user should also become familiar with
the relay as described in Chapter 2: Overview and Chapter 5: Setpoints.
Test personnel must be familiar with general relay testing practices and safety
precautions to avoid personal injuries or equipment damage.
This chapter is divided into several sections, as follows:
GENERAL:
outlines
procedures.
TEST EQUIPMENT: the test equipment required.
GENERAL PRELIMINARY WORK
LOGIC INPUTS AND OUTPUT RELAYS: tests all digital and analog inputs, the
A/D data acquisition system, and relay and transistor outputs.
DISPLAY, METERING, COMMUNICATIONS, ANALOG OUTPUTS: tests all
values derived from the AC current and voltage inputs.
PROTECTION SCHEMES: tests all features that can cause a trip, including
differential, overcurrent, over and underfrequency elements.
AUXILIARY PROTECTION/MONITORING FUNCTIONS
PLACING RELAY INTO SERVICE
SETPOINT TABLES
The 745 is realized with digital hardware and software algorithms, using extensive
internal monitoring. Consequently, it is expected that, if the input circuits, CTs, VTs,
power supply, auxiliary signals, etc., are functioning correctly, all the protection and
monitoring features inside the relay will also perform correctly, as per applied
settings. It is therefore only necessary to perform a calibration of the input circuits
and cursory verification of the protection and monitoring features to ensure that a
fully-functional relay is placed into service.
http://www.GEindustrial.com/multilin
Transformer Management Relay
safety
precautions,
conventions
745
used
in
the
test
7–1