T1 - Fault Detector Test; T2 - It Trip Supervision Test - GE LPS-O Instruction Manual

Line protection system
Table of Contents

Advertisement

5.1 MEASURING UNIT TESTS
The Fault Detector responds to sudden changes in current levels. Slow changes are not picked up.
1. Connect the relay as shown in Figure 4–3: PHASE TO GROUND TEST CONNECTIONS on page 4–16.
2. Set the relay into test mode 22 (the fault detector). The LUI displays
FAULT DETECTOR ON
3. Protection Settings:
Z1DISTANCE
(101)
Z2DISTANCE
(201)
Z3DISTANCE
(301)
Z4DISTANCE
(401)
OVERCURRENT
(601)
5
(605)
(610)
4. Set the voltages to zero.
5. Slowly increase I
rent to 0 A. The A1 contact should not close.
6. Immediately increase I
7. Immediately increase I
8. Reduce I
to 0.
op
1. Protection Setting:
CURSUPVISN
(501)
IT_PICKUP = 0.25 (0.05) Amps
2. Connect the relay as shown in Figure 4–3: PHASE TO GROUND TEST CONNECTIONS on page 4–16.
3. Set the relay into test mode 18 (IT Detector). The LUI displays:
IT DETECTOR ON
4. Set the voltages to zero.
5. Set I
to 0.35 (0.07) A rms and apply to the relay. The A1 contact should close. Lower I
op
rms, at which point the A1 contact should open.
6. Reduce I
to 0.
op
5-
2
Z1PHASE = NO
Z2PHASE = NO
Z3PHASE = NO
Z4PHASE = NO
50 = NO
50G = NO
51G = NO
to 1.2 (0.24) A rms, at approximately 0.1 (0.02) A per second. Slowly decrease the cur-
op
to 1.5 (0.3) A rms. The A1 contact should close momentarily.
op
to 2.5 (0.5) A rms. The A1 contact should close until current is removed.
op
LPS-O Line Protection System
5 FUNCTIONAL TESTS (FACTORY SETTINGS)
5.1.2 T1 – FAULT DETECTOR TEST
5.1.3 T2 – IT TRIP SUPERVISION TEST
to 0.15 (0.03) A
op