Obtaining Documentation And Submitting A Service Request - Cisco 1811 Quick Start Manual

Integrated services router cabling and installation
Hide thumbs Also See for 1811:
Table of Contents

Advertisement

Table 1
LEDs That Verify Installation (Continued)
LED
Meaning
PPP
Steady green—At least one PPP connection established.
Off—No PPP link established.
VPN
Steady green—At least one VPN tunnel established.
Off—No VPN tunnel established.
CF
Blinking green—CompactFlash memory being accessed. Do not remove CompactFlash memory.
Off—CompactFlash memory is not being accessed. It is safe to remove CompactFlash memory.
1. Inline power is a field-upgradable option only. It is not installed by default.
2. This LED is on the Cisco 1811 router only.
3. This LED is on the Cisco 1812 router only.
9

Obtaining Documentation and Submitting a Service Request

For information on obtaining documentation, submitting a service request, and gathering additional information, see the monthly
What's New in Cisco Product Documentation, which also lists all new and revised Cisco technical documentation, at:
http://www.cisco.com/en/US/docs/general/whatsnew/whatsnew.html
Subscribe to the What's New in Cisco Product Documentation as a Really Simple Syndication (RSS) feed and set content to be
delivered directly to your desktop using a reader application. The RSS feeds are a free service and Cisco currently supports RSS version
2.0.
9

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

1812

Table of Contents