Honeywell Cube M ST LED Manual page 2

Selftesting maintained emergency luminaire

Advertisement

Package Contents
1
Luminaire
1
Mounting accessories
1
Indication sign
1
Manual
General
Cube is a self-contained luminary with selftest
ΑΤΤΕΝΤΙΟΝ!!!
function.
1. Operations for installation, maintainance or
It can be configured as maintained or non-
testing must be done by authorized personnel
maintained.
only. Always use in any case round mains cable,
with a diameter of 5-10mm (H05RN-F type
Selftest Functions
2x1mm ) or any other type, at least equal to it's
Every 15 days the luminaire will perform an
mechanical and electrical properties).
emergency operation test. This will light the white
2. The device must be connected to the mains
LEDs for approximately 3 seconds. The red LED will
power supply through a fuse that is dependent
flash during this test sequence. Every 6 months the
on the total line's power load.
luminaire will perform a battery condition test. The
3. In case of battery replacement, it must be
test will last for the stated duration. The white LEDs
replaced by the same type, by the manufacturer
will be lit and the yellow LED will flash during this
or a competent person.
test sequence.
4. In case of inactive use for a period greater than 2
Note: When using DALI or Wireless communication,
months, disconnect the battery by pulling out
the frequencies and schedules for tests will instead
the battery's connector.
be determined by the connected PC software.
5.
The control gear within this luminaire is a built in
control gear which relies on the luminaire for
Manual Test Functions
protection against electric shock.
6. The control gear is proof against supply voltage
Emergency Operation Test
polarity reversal.
Press the TEST button less than 5 seconds. The
7. This control gear has mains connected primary
white LEDs light for about 3 seconds and the red
windings.
LED flashes.
8. I
t i
s not allowed to discard batteries into
common trash bins, they must be discarded
Battery Condition Test
only
Press the TEST button for 5 to 10 seconds. This test
incinerate.
will last for for the stated duration and can only be
performed when the battery is fully charged (steady
green LED). The white LEDs light and the yellow LED
flashes.
Connectors
CN1: Power connector
Resetting Errors
CN2: Communication Connector
Press the TEST button more than 10 seconds to
CN5: Module connector
delete all indicated errors. The luminaire enters
CN11: Non user connector
regular operation mode.
CN13: Non user connector
CN15: Indication LEDs connector
In case that the luminaire no longer meets its rated
duration
of operation, the battery must be
replaced.
Important notice when installing luminaires
within the same area!!!
To avoid that luminaires perform their battery test
at the same day, connect the battery packs with
more than 1,5 minutes in between.
Indications LED Status
BATT.
LAMP
CHARGE
Description
FAULT
FAULT
(green)
(yellow)
(red)
Charging
Fully charged
Battery fault or
emergency mode
Operational test
Light source fault
Autonomy test
Duration fault
1
Installation Methods
The luminaire can be installed in 3 different ways. It can be installed either at the ceiling, either hanging (hanging with
chain and hanging with eye bolts. For ceiling installation special accessories are including. For hanging installation only
eye bolts are including.
2
A
Ceiling
mounting
1
Installation Instructions
Changing Pictogram
in battery recycling points. Do not
1
3
Ceiling Mounting
Note:
Permanently
ON
Blink
Off
1
Indifferent
1
2
B
C
Hanging installation
Hanging installation
with chain
2
1
2
4
Follow the same steps for the remaining sides of the pictogram.
2
Mind the orientation of placement!!
The top cover placement is achieved
according to the bottom part of the
luminaire and the already installed
pictograms.
2
L N
C1 C2
L N C1C2
fasten securely the power cables. Power supply cables cross
2
section should be 0.8 – 3 mm . The C1 and C2 terminals are
used for elBus communication (optional), DALI communication
(optional) or voltage free contact (optional).
3
with hooks
5
Hanging Installation
1
1
L N
C1 C2
L N C1C2
cables. Power supply cables cross section should be 0.8 – 3
2
mm . The C1 and C2 terminals are used for elBus
communication (optional), DALI communication (optional) or
voltage free contact (optional).
3
5
3
Battery Connection
Make a hole in the center of the
rubber gasket by using a small
screwdriver. Pass the round
cable through the rubber
gasket and install the gasket in
the appropriate hole.
Connect the mains cable to
the respective terminal block:
L for live wire, N for neutral
and
for ground. Install the
included tie (if needed) to
4
6
2
Make a hole in the center of the
2
Battery Connection
rubber gasket by using a small
screwdriver. Pass the round
cable through the rubber
gasket and install the gasket in
the appropriate hole.
Connect the mains cable to
the respective terminal block:
L for live wire, N for neutral
and
for ground. Install the
included tie (if needed) to
4
6