Assembly And Installation; Assembly And Installation Procedure - Honeywell Miller SkyORB Installer And User Instruction Manual

Overhead rotational boom anchor
Table of Contents

Advertisement

Available languages

Available languages

5 .0 Asse m bly a nd I nst a lla t ion
5 .1 Asse m bly a nd I nst a llat ion Proc e dure
IMPORTANT: This assembly and installation procedure requires two people--a forklift operator and an additional person.
Using a forklift, move crate/pallet with SkyORB system components to installation location
recommended set-up patterns.
Crate/Pallet
Column/Mast/Boom
Assembly
weight of the truck(s). Do not use on loose gravel, soft gound, uneven surfaces, surfaces sloped more than 5 degrees, or on any surface
which may become excessively compliant when wet.
Fully set-up SkyORB systems may be moved from one location to another with a forklift. See 5.2 Moving the SkyORB System for additional
details.
Us e r I ns tr u cti o ns - E ngl i sh
St e p 1
where overhead anchorage system will be set-up.
Fig. 6 a
Base
Fig. 6 b
11
Crate/Pallet
Column/Mast/Boom
Assembly
Base

Advertisement

Table of Contents
loading

Table of Contents