Installing The Zoneline - GE Zoneline AZ95H09 Owner's Manual And Installation Instructions

Heat/cool pump
Table of Contents

Advertisement

Available languages

Available languages

Installing the Zoneline

locations.
7. Connect the top ductwork.
8. Connect the remote thermostat.
1. Plan for proper electrical supply, drains and ductwork locations.
2. Install the Wall Plenum and Louver
Refer to instructions included in the wall plenum kit RAVWPT15 for proper installation procedures.
3. Install the Zoneline Drain Platform
1.
2. Place the platform in the utility closet with the following clearance between it and the interior surface of the
walls/door/panel:
3. Complete rough in plumbing for primary and secondary condensation drains.
Condensate Disposal System
condensate onto the hot outdoor coil.
NOTE: If the condensate disposal system fails to remove all of the condensate from the unit, any
excess condensate will overflow from the drain pan into the secondary drain (if connected), and drain
outside the building. This is your indication that the chassis or drain requires servicing.
INSTALLATION SUMMARY
INSTALLATION INSTRUCTIONS
49-5000561 Rev. 1

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents