Drain Exiting Left Side; Drain Exiting Right Side; Counterflow Model Installed Horizontally With Right Side Down - Maytag Amana MEC96 Series Installation Instructions Manual

Two-stage, fsp category iv direct or non direct vent air furnace
Table of Contents

Advertisement

Drain Exiting Left Side (See Figure 26)
1. Install a field supplied rubber coupling secured with a
1 1/4" clamp to enable removing the trap for future
cleaning. Alternately, a PVC fitting may be glued on
the trap outlet.
2. Install drain per local and National codes.
Hose #4 x 3
Drain Exiting Right Side (See Figure 27)
1. Remove hose clamps and hoses from trap.
2. Remove trap and factory installed drain tube assemblies.
3. (Draining the Vent Elbow) Insert the non-grommet end
hose #10 into the cabinet back drain hole. Insert a
coupling into the drip leg of the vent-drain elbow and
secure with a silver clamp. Secure hose #10 on vent -
drain elbow barb fitting with a silver clamp.
4. (Draining the Collector Box) Insert non-grommet end of
hose #9 into the cabinet front drain hole and secure on
collector box drain port with a silver clamp.
5. Mate the drain trap inlets to the hoses and secure with
silver clamps.
6. Line up the trap mounting holes with the pre-drilled
holes in the furnace and secure with 2 screws removed
in step 2.
7. Refer to Field Supplied Drain section for instructions
on field supplied / installed drain on outlet of furnace
trap.
Hose #5
Figure 26
Counterflow Model Installed Horizontally
with Right Side Down (See Figure 28)
Minimum 5 1/2" clearance is required for the drain trap
beneath the furnace.
NOTE: For horizontal installations, some of the required
hoses are found in the factory-installed hose assemblies.
Remove the hose clamps to obtain the respective hoses
needed for installation, and install per the following
directions.
1. Remove the drain trap and factory installed drain tube
assemblies.
2. Remove two 1'' plugs from right side of cabinet.
3. (Draining the Collector Box) From outside the cabinet,
insert the non-grommet end hose #7 into the back drain
hole and secure to collector box drain port using a silver
clamp.
4. (Draining the Vent Elbow) Insert the straight barbed
coupling into the vent - drain elbow drip leg and secure
with a red clamp.
5. From outside the cabinet, insert te non-grommet end of
hose #8 into the front cabinet drain hole and secure on
the vent - drain elbow barb fitting using a red clamp.
6. Place the drain hoses on the trap inlets and secure
with silver clamps. The outlet of the trap must face
the original botom of furnace.
7. Using the two sheet metal screws provided in the
cabinet, secure the trap to the furnace.
8. Refer to Field Supplied Drain section for instructions on
field supplied/installed drain on outlet of furnace trap.
24
Figure 27

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents