Table Of Contents - Maytag Amana MEC96 Series Installation Instructions Manual

Two-stage, fsp category iv direct or non direct vent air furnace
Table of Contents

Advertisement

TABLE OF CONTENTS

S AFETY CONSIDERATIONS .......................................3
Shipping Inspection ..............................................4
To The Installer ..................................................4
PRODUCT DESCRIPTION ...........................................4
Features ...........................................................4
PRODUCT APPLICATION ............................................4
Clearances and Accessibility ...................................7
Existing Furnace Removal ......................................8
Thermostat Location ............................................8
INSTALLATION POSITIONS .........................................9
Furnace Suspension ..............................................9
Drain Trap and Lines .......................................... 10
Horizontal Furnace Leveling ................................ 10
Drain Pan ........................................................ 10
Freeze Protection ............................................. 10
Materials and Joining Methods .............................. 11
Termination Locations ........................................ 12
Standard Furnace Connections .............................. 13
Vent/Flue Pipe ................................................. 13
Direct Vent Installations ..................................... 14
Non-Direct Vent (Single Pipe) Piping ....................... 16
of Multiple Direct Vent Furnaces ....................... 18
Concentric Vent Termination ................................ 18
Side Wall Vent Kit ............................................. 19
General Drain Information .................................. 19
Field Supplied Drain ........................................... 19
Upflow Model Installed Vertically ......................... 20
Drain Exiting Right Side ...................................... 20
Drain Exiting Left Side ........................................ 20
with Right Side Down ..................................... 21
with Left Side Down ........................................ 21
Drain Exiting Left Side..................... ... ................22
Drain Exiting Right Side...................... .. ..............23
Right Side Down..................................... ...........23
Left Side Down................................... ..... .........23
ELECTRICAL CONNECTIONS ..................................... 24
Wiring Harness ................................................. 24
115 Volt Line Connections ................................... 24
Junction Box Relocation ..................................... 25
24 Volt Thermostat Wiring ................................... 25
Fossil Fuel Applications ....................................... 26
Twinning ........................................................ 26
GAS SUPPLY AND PIPING ......................................... 27
High Altitude Derate .......................................... 27
Propane Gas Conversion ...................................... 28
Gas Piping Connections ....................................... 28
Propane Gas Tanks and Piping ............................... 29
CIRCULATING AIR & FILTERS .................................... 30
Duct work - Air Flow ......................................... 30
Checking Duct Static .......................................... 30
The Return Air Duct work ................................. 32
Upright Installations ......................................... 32
Horizontal Installations ..................................... 32
STARTUP PROCEDURE & ADJUSTMENT ........................ 32
Drain Trap Priming ............................................ 33
Furnace Operation ............................................. 33
Gas Supply Pressure Measurement .......................... 33
DIP Switch Settings ............................................ 35
Temperature Rise ............................................... 48
Circulator Blower Speeds .................................... 48
Blower Heat Off Delay Timings .............................. 49
NORMAL SEQUENCE OF OPERATION............................ 49
Power Up ........................................................ 49
Heating Mode ................................................... 49
Cooling Mode ................................................... 50
Fan Only Mode ................................................. 50
OPERATIONAL CHECKS ........................................... 50
SAFETY CIRCUIT DESCRIPTION ................................. 50
Integrated Control Module ................................. 50
Primary Limit ................................................... 50
Auxiliary Limit .................................................. 50
Rollout Limit....................................... ..... .......50
Pressure Switches .............................................. 50
Flame Sensor ................................................... 50
Troubleshooting ............................................... 51
Checking Flame Signal ........................................ 51
Limit Fault Codes .............................................. 51
Diagnostic Chart ............................................... 51
Fault Recall .................................................... 51
Resetting From Lockout ...................................... 52
MAINTENANCE .................................................... 53
Annual Inspection ............................................. 54
Filters ........................................................... 54
Burners .......................................................... 55
Induced Draft and Circulator Blowers .................... 55
Only) ............................................................. 55
BEFORE LEAVING AN INSTALLATION ............................ 55
REPAIR AND REPLACEMENT PARTS.............................. 55
TROUBLESHOOTING CHART ..................................... 56
WIRING DIAGRAM ................................................. 58
2

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents