Install A Hot-Swap Power Supply - Lenovo ThinkAgile MX Certified Node 2U User Manual

Table of Contents

Advertisement

Step 2.
Press the release tab toward the handle and carefully pull the handle at the same time to slide the
hot-swap power supply out of the chassis.
Figure 22. Hot-swap power supply removal
After removing the hot-swap power supply:
1. Install a new power supply or install the power-supply filler to cover the power supply bay. See "Install a
hot-swap power supply" on page 51.
Important: To ensure proper cooling during normal server operation, both of the power supply bays
must be occupied. This means that each bay must have a power supply installed; or one has a power
supply installed and the other has a power supply filler installed.
2. If you are instructed to return the old hot-swap power supply, follow all packaging instructions and use
any packaging materials that are provided.

Install a hot-swap power supply

Use this information to install a hot-swap power supply.
Chapter 4 "Read
the
installation
Guidelines" on
page 27
The standard shipping has only one power supply installed in the server. For redundancy and hot-swap
support, you must install an additional hot-swap power supply. Certain customized models might be shipped
with two power supplies installed.
"ATTENTION:
Static Sensitive Device
Ground package before opening"
on page 29
Chapter 5
.
Hardware replacement procedures
51

Advertisement

Table of Contents
loading

Table of Contents