Page 2
Heavy snow may cause the roof or entire structure to collapse. Note: Dancover warranty applies only to the normal use of the greenhouse, normal wear and tear excepted, in accordance with written use instructions or manual. The warranty does not apply to damage caused by accident, abuse, misuse or modification of the greenhouse.
Page 3
Greenhouse Assembly Instructions size: 314Lx190Wx214Hcm 6m² 12/08/2019 IMPORTANT You must read these instructions carefully before you start to assemble this greenhouse.Please ensure that you find all parts in the carton box in the correct type and quantity as mentioned in the list illustrated in every page accordingly.
Page 4
TOOLS & EQUIPMENT REQUIRED SAFETY ADVICE We strongly recommend the use of work gloves during assembly. Protective Equipment: Do not attempt to assemble the greenhouse in windy or wet conditions, 1.Helmet Do not touch overhead power cables with the aluminum profiles. Always wear shoes and safety goggles when working with extruded aluminum.
Page 5
PRODUCT SIZE Firstly, make sure a good installation location. Find a flat ground which is 2 times bigger than the Green house before installation. OTHER CAUTIONS 1. 2-3 people required, one is for measuring & taking marks to ensure the installation dimension ,the second person is responsible for the installation and the last one do as assistant and assure the safety.
Page 6
PARTS LIST(2-1) Front wall and back wall DOOR NO. Qty. Qty. CA01 CD01 1 1122mm 1784mm CA03 CD03 1 CA02 1310mm CD02 4 482mm CA05 CD07 1 679mm 1748mm CA07 CA05 CA07 CD09 1 728mm CA08 556mm CD08 1 CA09 588mm 1812mm CA11...
Page 7
PARTS LIST(2-2) Left and right walls and top NO. Qty. Polycarbonate board 1310mm 1102mm CA09 588mm CP4R CP4L 588mm 1300mm 1100mm 1250mm CA18 573mm C31E 1536mm CP11 C32E 1554mm C38E 1525mm CP10 C22EL 1564mm C22ER NO. Qty. NO. Qty. C10C M5x20 CP7R CP7L...
Page 8
Towards the white film side to the sun as it is UV-protected. Screw installation Place the screw into the groove,turn clockwise until it stops turning.Adjust the screw by hand and twist so threads fix it in place. Place other parts on screw and assemble nut .
Page 9
Installation instructions and illustrations 1.Make sure the ground flat and firm before installing, avoid the ground subsidence and cause the 1.Before installation, you need to know the meaning of the following symbols. greenhouse to tilt. 2.Follow the pattern to install faster and less effort. 2.
Page 25
Door CD01 CP1 x3 CD02 x4 F5 x6 CD03 5 x3 F1 x8 5 x3 F1 x4 CD02 F5 x6 CD01 CD02 CD02 CD02 CD02 CD02 CD02 WD-40 CD01 F1 Easier to install with WD-40 lubricant. CD03 CD03 CD02 back back back CD02...
Page 26
WINDOW F2 x8 S8 x2 CW1 x2 CW2 x2 F9 x2 CP2 x2 S9 x2 W4 x2 F8 x2 BW3 x4 Ⅱ Ⅰ Ⅲ WINDOW back Note toward the UV surface to the Sun. Note the direction of part No.3 Note the direction of parts F8and F9 F2 will be easy to install by using lubricants -24-...
Page 27
Assembled above the foundation F4 x36 Ⅲ Ⅰ Ⅲ Ⅱ -25-...
Page 28
The back wall is fixed with a ladder to 3 x2 avoid being blown down by the wind. F4 x18 Ⅰ Ⅱ Ⅱ Ⅱ Ⅰ Ⅰ It is recommended to loosen the screw and adjust the fit clearance. -26-...
Page 29
The front wall is fixed with a ladder to 3 x2 avoid being blown down by the wind. F4 x18 Ⅰ Ⅱ Ⅱ Ⅱ Ⅰ Ⅰ It is recommended to loosen the screw and adjust the fit clearance. -27-...
Page 30
You can choose the location of the hanging window installation according to your own usage habits and air circulation. F4 x 53 CA09 WINDOW C10C C38E C38E -28-...
Page 41
Note the use of the window OPEN CLOSE -39-...
Page 42
Ⅰ L5 x3 F05 x12 WD-40 Door Ⅰ Ⅰ Ⅱ Ⅱ Ⅰ Door Iatch WD-40 Determine the appropriate location Adjust L3 according to the before installing the door touch L2. position of the latch. -40-...