Fujitsu PRIMERGY CX400 M4 Operating Manual page 52

Server enclosure
Hide thumbs Also See for PRIMERGY CX400 M4:
Table of Contents

Advertisement

Starting up
Installing the carrier rails
Ê Clarify the position of the system unit in the rack.
Ê Mark the position of the bottom edge of the server enclosure on the support
uprights.
Ê Identify the right and the left rail.
Figure 17: Attaching the left carrier rail
Figure 18: Adjusting the positioning clip
Ê Move the left carrier rail towards the rear side (2) while holding the
positioning clip (1). The mounting aid must lock in the corresponding holes.
Ê Release the positioning clip (1) after the designated position is reached.
52
Operating Manual
CX400 M4

Advertisement

Table of Contents
loading

Table of Contents