Grounding Requirements; Grounding For Cabinet Mounting - Honeywell ML200 Series Installation And Commissioning Manual

Table of Contents

Advertisement

ATTENTION
If bases are installed without adequate spacing, the air temperature (Tb + Tr) may rise up to
l
15°C for the fiber optic module and the module installed right above the power module.
Ensure that air temperature around the module does not exceed 55°C.
l
3.1.3

Grounding requirements

Grounding for cabinet mounting

1. Take sufficient measures against noise in PLC, making it possible to be used without
2. Use dedicated grounding for the wires as far as possible.
3. If the grounding is functional, use class 3 grounding, (grounding resistance must be 100Ω or
4. If it is not possible to use dedicated grounding, use common grounding, as depicted in the
grounding.
less).
following figure.
Chapter 3 - Plan and Install MLPLC
- 27 -

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Ml200rMl200-iecMl200

Table of Contents