Figure 4-10 Removing a BIM
Step 3 Secure the new BIM on the fastener, and connect the BIM cables.
Step 4 Press the networking switch on the BIM for 2 seconds based on the battery number
corresponding to the new BIM. When the RUN/ALM indicator turns from steady red to
blinking green at super short intervals, and finally to blinking green at long intervals, the BIM
connects to the CIM network.
Step 5 Verify that the BIM is networked. On the home screen of the CIM WebUI, choose
Monitoring > CIM System > Running Control, click BIM start blinking, select the
corresponding battery number from the range of 1–300, and click Submit. If the BIM blinks
successfully, the installation succeeds. If the BIM fails in blinking, check the cable
connections and reinstall the BIM.
Figure 4-11 Setting the BIM blinking
Step 6 Replace and network other faulty BIMs in the same way.
Step 7 Press the CIM networking switch for 2 seconds. When the RF_Z indicator on the CIM turns
from blinking green at super short intervals to blinking green at long intervals, the
replacement is complete.
Issue 01 (2019-03-05)
If the BIM blinks successfully, click BIM stop blinking, select the battery number from the range of
1–300, and click Submit to stop the BIM blinking.