Page 1
INSTALLATION INSTRUCTIONS SAE COMPLIANT LIGHTS *THESE INSTRUCTIONS ARE FOR THE FOLLOWING LIGHTS: (2) SAE SR-M , (2) SAE D-XL , (2) SAE Q-SERIES ® ® ® IMPORTANT THANK YOU FOR PURCHASING RIGID INDUSTRIES’ PRODUCTS FOR YOUR VEHICLE. Please read through all of these Instructions and tips before proceeding with the installation. We do our best to provide a simple installation process for all applications however a professional installation is always recommended.
Page 2
WIRING INSTRUCTIONS SAE D-SERIES 1. Place 5/16-18 Carriage Bolt (E) into A - LED Light (Housing) Mounting Bracket (D). 2. Use M6 Allen Socket Head (B) and B - M6 Allen Socket Head (2) M6 Nyloc Nut (C) to attach Mounting C - M6 Nyloc Nut (2) Bracket (D) to Housing (A).
Page 3
SAE SR-M SERIES Place 5/16-18 Carriage Bolt (E) into Mounting Bracket (D). Use the M6 Allen Socket Head (B) and the M6 Nyloc Nut (C) to attach the Mounting Bracket (D) to the Housing (A). Drill a 5/16” hole into desired mounting location.
SAE Q-SERIES Step 1 The illustration blow demonstrates how the nuts will be held in place by the Mount Bushings. This pertains to both the left and right sides of the housing. (See Figure Below) Mount Bushing M6 Square Nut M8x1.25 Hex Nut Step 2 You will need to choose if you would like to mount your light in a stationary position or with one larger...
WIRING INSTRUCTIONS IMPORTANT Always disconnect the vehicle batter terminals before servicing the electrical system Fuse Switch Relay Battery Eyelets Deutsch Connector 1. When routing wire harness through any metal surface be sure it is free of any sharp edges and protected using wire sheathing or a grommet.
This manual is also suitable for:
Sae q seriesSae d-xl seriesSae e seriesSae d seriesSae sr series