S7 Testing; Description; Test Configuration - GE MM3 Instruction Manual

Motor manager 3
Hide thumbs Also See for MM3:
Table of Contents

Advertisement

4 SETPOINTS

4.10 S7 TESTING

]] SETPOINTS
]] S7: TESTING
This page contains information about the version of the MM3 and data for GE Power Management service
technicians. Setpoints Page 7 is divided into seven sections: TEST CONFIGURATION, TEST RELAYS AND
LEDS, CURRENT SIMULATION, ANALOG OUTPUT SIMULATION, ANALOG INPUT SIMULATION, SWITCH
INPUTS SIMULATION, and THERMISTOR SIMULATION.
]] SETPOINTS
]] S7: TESTING
PATH: SETPOINTS MMMMMMM S7 TESTING M TEST CONFIGURATION
DISPLAY CONTACTOR
MONITORING: NO
MESSAGE
MONITORING DISABLED
MESSAGE
FOR:
15 min
DISABLE STATISTICS
MESSAGE
LOGGING: NO
GE Power Management

] TEST CONFIGURATION

MESSAGE
]
] TEST RELAYS & LEDS
MESSAGE
]
] CURRENT SIMULATION
MESSAGE
]
] ANALOG OUTPUT
MESSAGE
] SIMULATION
] ANALOG INPUT
MESSAGE
] SIMULATION
] SWITCH INPUTS
MESSAGE
] SIMULATION
] THERMISTOR
] SIMULATION
MESSAGE
Range: YES, NO
This message enables or disabled contactor monitoring during simulation
tests and prevents Open Control Circuit and Welded Contactor Alarms.
Range: 5 to 300 minutes, UNLIMITED; Step: 5
Selects the desired length of time that monitoring will be disabled.
Range: YES, NO
This setpoint determines whether statistics are accumulated during
simulation tests (for example, number of starts, etc.).
MM3 Motor Manager 3
4.10 S7 TESTING

4.10.1 DESCRIPTION

4.10.2 TEST CONFIGURATION
4
4-39

Advertisement

Table of Contents
loading

This manual is also suitable for:

Motor manager 3

Table of Contents