Download Print this page

GE WE25M46 Installation Instructions Manual page 4

Lp propane gas conversion kit

Advertisement

Available languages

Available languages

10. Disconnect the electrical power when completed.
11. Reinstall the test plug in the manifold pressure
tap.
12. Reassemble the drum into dryer.
13. Replace the belt removed earlier.
• Push the left arm to the left (appx. 1 inch)
• Route the belt on the right side of the idler pulley
and under the motor pulley
• Slowly release the left idler arm and push the
right idler arm to the right
• Place the belt on the left side of the right idler
pulley
• Slowly release the right idler arm until the belt is
taut
• Slowly turn drum by hand to ensure belt is
aligned and not twisted
14. Remount front and top.
15. Reconnect the electrical power and start the
dryer. Flame appearance may be observed by
using a mirror and looking through the viewer
located in the base on the right side.
Mirror
Flame observation (side panel removed for viewing
purpose)
16. Open dryer door. Apply the Conversion Rating
Plate on the lower right corner of the door
opening, and the Responsibility Label on the
lower left corner.
• Complete the installation by following the Installation
Right side
4
STEP 5
COMPLETE INSTALLATION
Instructions that came with the dryer.

Advertisement

loading