Swing Internal Gear - Hitachi EX1900-5 Operator's Manual

Hydraulic excavator
Table of Contents

Advertisement

Swing Internal Gear --- every 2000 hours
CAUTION: Adding or changing swing internal
gear grease and rotating the upperstructure must
be done by one person. Before you start, clear the
area of all persons.
Each time you leave the cab
• • • •
Lower the bucket to the ground.
• • • •
Stop the engine.
• • • •
Pull the pilot control shut-off lever to the LOCK
position.
• • • •
Use handrails.
1. Park the machine on a level surface.
2. Lower the bucket to the ground.
3. Turn the auto-idle switch off.
IMPORTANT: The turbocharger may be damaged if the
engine is not properly shut down.
4. Run the engine at slow idle speed without load for five
minutes.
5. Turn the key switch OFF. Remove the key from the
key switch.
6. Pull the pilot control shut-off lever to the LOCK posi-
tion.
7. Remove cover (2) on the left side of the upperstruc-
ture. In order to add new grease evenly to the swing
gear, swing the upperstructure twelve 30° intervals
(one full turn) and add grease at each interval using a
putty knife.
8. In case the grease deteriorate and/or water becomes
mixed in the grease, change grease by following the
procedures below.
9. Remove cover (1) on the underside of the swing gear
housing and thoroughly remove old grease from the
swing gear.
10. Remove cover (2) on the left side of the upperstruc-
ture. In order to add new grease evenly to the swing
gear, swing the upperstructure twelve 30° intervals
(one full turn) and add grease at each interval using a
putty knife.
Total amount of grease applied should be approxi-
mately 180 liter (47.6 US gal).
MAINTENANCE
7-29
1
M18C-07-010
2
M18C-07-051

Advertisement

Table of Contents
loading

Table of Contents