Yamaha YFM70RY Service Manual page 69

Table of Contents

Advertisement

1. Handlebar switch lead
2. Clutch switch lead
3. Parking brake cable
4. Clutch cable
5. Front brake hose
6. Front brake light switch lead
7. Throttle cable
8. Meter assembly lead
9. Radiator fan motor breather hose
10. Wire harness
11. Coolant reservoir breather hose
12. Headlight lead (left)
13. Coolant reservoir hose
14. Rectifier/regulator lead
15. Ignition coil leads
16. Radiator fan motor lead
17. Headlight lead (right)
18. Main switch lead
A. Fasten the handlebar switch lead and clutch switch
lead with the plastic bands at the bends in the
handlebar. Point the end of each plastic band
forward.
B. Fasten the front brake light switch lead with the
plastic bands at the bends in the handlebar. Point
the end of each plastic band forward.
C. Route the parking brake cable and clutch cable in
front of the front brake light switch lead and main
switch lead.
D. Connect the coolant reservoir hose to the radiator.
E. Route the wire harness above the fuel tank shield.
F. Place the joint coupler in the area shown in the
illustration.
G. Route the coolant reservoir breather hose under
the wire harness and over the handlebar switch
lead, clutch switch lead, front brake light switch
lead, main switch lead, and meter assembly lead,
and then fasten the hose with the holder on the fuel
tank shield.
H. Route the radiator fan motor breather hose in front
of the handlebar switch lead, clutch switch lead,
front brake light switch lead, main switch lead, and
meter assembly lead.
I.
Secure the plastic band by inserting the projection
on the band into the hole in the frame, and then
fasten the wire harness with the band, making sure
to point the end of the band rearward.
J. Secure the plastic band by inserting the projection
on the band into the hole in the frame, and then
fasten the wire harness and radiator fan motor lead
with the band, making sure to point the end of the
band rearward.
K. Pass the clutch cable and parking brake cable
through the guide.
L. Pass the radiator fan motor breather hose, coolant
reservoir hose, front brake light switch lead, main
switch lead, handlebar switch lead, clutch switch
lead, and meter assembly lead through the guide
on the fuel tank shield, and then connect the leads
under the guide.
M. Route the throttle cable in front of the clutch cable
and parking brake cable, then above the fuel tank
shield.
N. Pass the throttle cable, clutch cable, parking brake
cable, front brake light switch lead, main switch
lead, handlebar switch lead, clutch switch lead,
meter assembly lead, and radiator fan motor
breather hose through the guide.
O. Route the front brake light switch lead behind the
front brake hose and throttle cable.
2-42
CABLE ROUTING

Advertisement

Table of Contents
loading

This manual is also suitable for:

Raptor 700r 2009

Table of Contents