GE D25 User Manual page 102

Substation controller
Table of Contents

Advertisement

D25
User's Manual
Downloading a Configuration,
Procedure: Download Files (continued)
Step
3
4
5
6
7
Invoking the Return to BootROM command will completely disable the
system.
8
9
10
102
Continued
Launch System Monitor
Log into WESMAINT.
Select option 2, System Functions
Select option 3, 68K Monitor
Result: The D25A> prompt appears, indicating that the
Application Monitor is running.
At the D25A> prompt type rtb
For other available commands type help
At the Return to the BootROM Operating System? (yes/no)
prompt, type yes
ENTER
Note:
The monitor is not case-sensitive, but Y is not acceptable.
Result: The system restarts.
Login to System Monitor
After the restart is complete, press
Result: The Login: prompt displays.
Type the login name harris
Result: The system performs self-diagnostics to ascertain whether
any Flash EPROM memory is in use.
The D25S> prompt appears, indicating that the System
Monitor is running.
Clear FLASH EPROM
Type erase and press
ENTER
Note:
The recommended procedure is to clear Flash EPROM
memory — no matter what the system check reveals.
994-0081-3.00-21
GE Grid Solutions
Action
ENTER
ENTER
.
ENTER
and password rd
ENTER
(not case-sensitive)
.
ENTER
GE Information

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents