Sharp AH-A129E Service Manual page 12

Table of Contents

Advertisement

AH-A129E
AU-A129E
14.Test mode
14-1 TEST 1 (For control circuit operation checking)
Make terminals 1 and 2 of connector CN4 short-circuited and supply power.
The timer's periods become shorter i.e. a 3 minute cycle is carried out in 3 seconds, except for ;
The operation LED flicker's period
in Test run
The protector timer
The defrost timer
14-2 TEST 2 (For output of each operation checking)
Test mode is for checking output of each operation. Keep pushing both the buttons, "AUX." and "TEST
RUN", and supply the power, the system will go to the test 2 mode.
In this mode, the output of operation is switched by the "TEST RUN" button in the unit or the "OI" button in
the remote controller. Use the "AUX." button to back to step 1. Normal outputs are shown in Table H-5.
Step
Output for outdoor unit
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
(Back to step 1)
1
: 7˚C
Room temp. 42˚C
: 7˚C
(Room temp.) or (Room temp.)
2
: –2˚C
Pipe temp.
: –2˚C
(Pipe temp.) or (Pipe temp.)
3
: ON in the case of Power on start
not shortened
Table H-5
RED
OFF
1
ON
Flickering
OFF
ON
OFF
ON
OFF
ON
OFF
OFF
OFF
OFF
OFF
OFF
OFF
ON
OFF
OFF
OFF
ON
OFF
OFF
OFF
OFF
OFF
ON
OFF
ON
OFF
OFF
OFF
ON
OFF
OFF
OFF
ON
OFF
ON
OFF
ON
OFF
OFF
OFF
OFF
42˚C
42˚C
42˚C
Lamps
Indoor
Fan motor
YELLOW
2
OFF
ON
D
OFF
M
ON
L
OFF
D
OFF
UL
OFF
3
H
ON
M
ON
L
ON
OFF
OFF
OFF
ON
OFF
OFF
OFF
ON
OFF
OFF
OFF
OFF
OFF
ON
OFF
OFF
OFF
OFF
OFF
ON
OFF
ON
OFF
OFF
OFF
OFF
OFF
ON
OFF
ON
OFF
12
Louver
OPEN
OFF
OFF
CLOSE
OFF
OFF
OFF
OFF
OFF
OFF
OFF
OFF
OFF
OFF
OFF
OFF
OFF
OFF
OFF
OFF
OFF
OFF
OFF

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Au-a129e

Table of Contents