GE C70 Instruction Manual page 115

Capacitor bank protection and control system ur series
Hide thumbs Also See for C70:
Table of Contents

Advertisement

4 HUMAN INTERFACES
3.
Remove the tool and attached LED label as shown below.
4.
Slide the new LED label inside the pocket until the text is properly aligned with the LEDs, as shown below.
The following procedure describes how to remove the user-programmable pushbutton labels from the C70 enhanced front
panel and insert the custom labels.
1.
Use the knife to lift the pushbutton label and slide the tail of the label tool underneath, as shown below. Make sure the
bent tab is pointing away from the relay.
GE Multilin
C70 Capacitor Bank Protection and Control System
4.3 FACEPLATE INTERFACE
4-21
4

Advertisement

Table of Contents
loading

Table of Contents