GE PQMII Instruction Manual page 34

Power quality meter
Table of Contents

Advertisement

CHAPTER 2: INSTALLATION
The 2½ element 4-wire wye connection can be used for situations where cost or size
restrictions limit the number of VTs to two. With this connection, Phase Vbn voltage is
calculated using the two existing voltages. Select the
S2 SYSTEM SETUP
CURRENT/VOLTAGE
setpoint.
CONFIGURATION
VT WIRING:
"4 WIRE WYE (2 VTs)"
This wiring configuration will only provide accurate power measurements if the voltages
are balanced.
2–6
PQMII POWER QUALITY METER – INSTRUCTION MANUAL

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Pqm ii

Table of Contents