Output Shaft End Play Inspection And Adjustment - Polaris 1999 Sportsman 400 Service Manual

Table of Contents

Advertisement

TRANSMISSION
a.
Ensure that
the O-ring
ente rs
the
transmission
case
wit
hout
dam
age.
b.
Slowl
y rotate
the
pin
ion gea
r
assemb
ly
(Fig-
ure
128)
back
and
forth
to ens ure the
ge
ars
mesh properly
witho
ut
damage.
c.
Have
an
assi stant
slow
ly rota
te the
front out-
put shaft whil
e
screw ing the front output
housing
onto
the tran
smi ssion
cas
e.
As
gear
backla sh is reduced
to
zero, the
shaft
wi
ll
be-
gin to
bind.
At
this
point
stop screw ing
in
and
back the
front output
housing o
ut
ofthe
tran
s-
mission
case
by 1/4 of a
tum.
d.
If
none
of the
internal
compone nts w
ere
re-
placed.
the
alignment
ma
rk
made
in
Removal
Step 2, between the front
outp
ut
housing
and
the
transmission
case (Figu re
123)
should
now
be aligned .
e.
Measure
the
output gear
backlash as de-
sc
ribed
under
Output
Shaft
Gear Backlash
In-
spection
and Adj ustment in
this
cha pter.
18. Clean the
scaling sur faces
of
the tran
smission
case
(B
,
Figure
127)
and
the insid e
surface of
the
bottom
access
plate
w
ith
an
ae
roso l part
s clean er.
279
19.
Apply an even coat
of
ThreeBond
12 15,
or
equivalent , gas
ket
sea
lant
to
the sealing surface of
the
tran sm ission case
(Fig ure
129).
20.
Install
the bottom access
plate,
bolts a
nd
lockwashers (Fi
gur e
130). Tight en
the screws to
the
torqu
e
spec ilicatio n
listed
in Table 1.
2
1.
Install
a
new
fro
nt
sea
l
into
the
output
housing.
Press
it in
unti
l
it
is
flush
with
the housing.
22.
Tight
en
the o
utput
ho usin g
pinch
bo
lts (Figure
131)
sec
ure
ly.
Outp
ut S
ha ft
E
nd Pi
a )'
Inspec
tion
a
nd Adjustme nt
Thi
s pro cedure requires
the
use of
a
dial
indicator
and stand. It
is
recommended
that a Polaris dealer-
ship
perform this
pro
cedure
due to
the
special tool
s
and expert
ise
required .
I
.
Install
the
shaft
and inner
bearing
into
the
trans-
mission
end of
the fron
t
o
utput hou
sin g .
Push
it
in
until it stops.
II
2.
Turn
the
front
output
hou sing
over and
install
the
out
er bear ing
ontu
the
sha
ft.
Push it
in
until
it is
tull
y
seated in
the housing.
NOTE
Do
not
insta
ll
the origi
nal shims
be-
twee
n
the
shafs
and the
circltp at this
time.
3.
Install the circl
ip
onto the
sha
ft. It
may
be neces-
sary
to tap the ei
rclip
into
place. Make
sure
it
is
cor -
rectly seated
in
the
sha ft groove.
4.
Install
the hou sing
in
a
vise
w
ith
so
ft
j
aws so it
is
secure,
Do
not
overtighten
as
the hou
sing may be
damaged.
5. Set
up a
dial
indicator so it to
uches the
end of
the
output
sha
ft.
6. Push the
output
shaft
a
ll
the way into
the housing
and
zero the dial
ind
icator.
7.
Slow ly
pull
the ou
tput
shaft ou
t
from
the
hou sin g
and
note the readi ng
without
any
shims
.
8. Measur e the
thick
ness of the ex
isting shims and
not
e
the dimension.
9.
To ca
lc ulate COITect end
play,
subtract
the tota
l
shim
thick ness measur ed
in
Step 8,
from
the
end
play mea
sured
in
Step 7.
Add
or
subtract shims
to
ac
hieve
the end play
spec ifica tion
listed
in
Ta
b le
2.
Rep
laceme nt shims
are avail able
from
Polaris
deal-
erships in
five different thickness.

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents