Download Print this page

Huawei PDC-0091V2ACIOA Quick Installation Manual page 13

Advertisement

1. The table lists only the cables directly connected to the PDU. For details about other cables and
cable types, see the quick installation guides for related devices.
2. Configure colors for the cables prepared onsite in accordance with the local regulations.
 Torque for tightening power cables
Device
UPS2000-G-6 kVA
UPS2000-G-10 kVA
PDU
 Connecting cables to the PDU for a 1+1 or 2+0 UPS2000-G-10 kVA parallel system (three-phase input single-phase
output)
MBS is short for maintenance bypass switch.
Connect cables from bottom to top: Install cables for devices at the bottom and then devices on the top. When connecting
cables to one device, connect those at the bottom first and then those on the top.
7
8
Short-circuit N wiring terminals on the AC MAIN INPUT power cable and AC BYPASS INPUT power cable.
Tool
Torque
screwdriver
6
4
Screw
Torque
M4 x 0.7p
1.3 N· m
M5 x 0.8p
1.5 N· m
M5 x 0.8p
1.5 N· m
5
3
1
2
12

Advertisement

loading

This manual is also suitable for:

V100r001