  • Page 1 PDC-0091V2ACIOA V100R001 Quick Installation Guide Issue: 04 Part Number: 31505550 Date: 2014-06-25 HUAWEI TECHNOLOGIES CO., LTD.
  • Page 2 Huawei. Huawei will not be liable for any consequences that are caused by the violation of safety regulations and design, production, and usage standards.
  • Page 3 Appearance PDC-0091V2ACIOA PDC is short for power distribution cabinet. PDU is short for power distribution unit. UPS is short for uninterruptible power system. PDU Model PDC-0091V2ACIOA UPS2000-G-6K/10KRTS, UPS2000-G-6K/10KRTL, and UPS2000-G-15K/20KRTL Applicable UPS (Three-Phase Input Single- Phase Output and Single-Phase Input Single-Phase Output)
  • Page 4: Unpacking And Checking

    Check the PDU bar code, which is at the rear panel of the PDU, and ensure that it complies with the order. If there is any discrepancy, contact your local Huawei office immediately. Device Movement Regulations Do not move the PDU by holding its mounting brackets, front panel, or terminal cover. When you move it, see the movement regulations.
  • Page 5: Rack-Mounting The Pdu

    Mechanical Installation Rack-mounting the PDU This document uses a 19-inch rack as an example. For other racks, see the related UPS quick installation guide. Install mounting brackets. Install PDU. There are two methods. Method 1: Floating nuts + Common guide rails Align the lower plane of the guide rail with the lower edge of a U scale.
  • Page 6 Method 2: Adjustable guide rails (optional) + Floating nuts A. Fix the position of the guide rails (2 U) on the rack align the lower edge of a guide rail with the lower edge of a U scale. B. Engage the mounting brackets on both ends of the guide rail into the mounting holes, and then secure the back end of the guide rail with M6 x 16 panel screws.
  • Page 7 2. Do not push the guide rails out of the race when putting the PDU into the rack, as the front end of the guide rails are not screwed. (Optional) 3 U PDC-0091V2ACIOA 2U UPS (Optional) 3 U battery pack...
  • Page 8 280 mm) between the support bases, place devices on the support bases, and secure them. After the PDU is tower-mounted, seal the four screw holes on the top with rubber plugs that are delivered with the PDU. 3 U PDC-0091V2ACIOA Connecting...
  • Page 9: Cable Installation

    Cable Installation Open the circuit breakers on the PDU. Loosen screws to remove the busbar cover. Connect cables. Making OT Terminal 1. Use hydraulic pliers of proper specifications that are compatible with the used OT terminals. For example, OT terminals that have a cross-sectional area of 6 mm² should be crimped by hydraulic pliers that have the same cross-sectional area.
  • Page 10 Connecting cables to the PDU for a 1+1 or 2+0 UPS2000-G-6 kVA/10 kVA parallel system (single-phase input single- phase output)  Torque for tightening power cables Device Tool Screw Torque UPS2000-G-6 kVA M4 x 0.7p 1.3 N· m UPS2000-G-10 kVA M5 x 0.8p 1.5 N·...
  • Page 11 Item Appearance Specifications Remarks Prepared Maintenance onsite bypass port RVV 4 x 0.5 (connectors cable provided) Prepared communications SBYV-100 4 x 2 x 0.5 onsite port cable Mapping between cable connectors for CAN communications ports  Connecting cables to the PDU for a 1+1 or 2+0 UPS2000-G-6 kVA/10 kVA parallel system (single-phase input single-phase output) MBS is short for maintenance bypass switch.
  • Page 12 Connecting cables to the PDU for a 1+1 or 2+0 UPS2000-G-10 kVA parallel system (three-phase input single-phase output)  Cable list Item Appearance Specifications Remarks 10 mm² (1+1 UPS2000-G-10 kVA PDU AC parallel system) Prepared OUTPUT power 16 mm² (2+0 onsite cable UPS2000-G-10 kVA...
  • Page 13 1. The table lists only the cables directly connected to the PDU. For details about other cables and cable types, see the quick installation guides for related devices. 2. Configure colors for the cables prepared onsite in accordance with the local regulations. ...
  • Page 14 Connecting cables to the PDU for a 1+1 UPS2000-G-15 kVA/20 kVA parallel system (single-phase input single-phase output)  Torque for tightening power cables Device Tool Screw Torque UPS2000-G-15 kVA M5 x 0.8p 1.5 N· m UPS2000-G-20 kVA M5 x 0.8p 1.5 N·...
  • Page 15 Item Appearance Specifications Remarks Prepared Maintenance onsite bypass port RVV 4 x 0.5 (connectors cable provided) Prepared communications SBYV-100 4 x 2 x 0.5 onsite port cable Mapping between cable connectors for CAN communications ports  Connecting cables to the PDU for a 1+1 UPS2000-G-15 kVA/20 kVA parallel system (single-phase input single- phase output) MBS is short for maintenance bypass switch.
  • Page 16 Connecting cables to the PDU for a 1+1 UPS2000-G-15 kVA/20 kVA parallel system (Three-phase input single-phase output and One Mains Input)  Torque for tightening power cables Device Tool Screw Torque UPS2000-G-15 kVA M5 x 0.8p 1.5 N· m UPS2000-G-20 kVA M5 x 0.8p 1.5 N·...
  • Page 17 Item Appearance Specifications Remarks Prepared Maintenance onsite bypass port RVV 4 x 0.5 (connectors cable provided) Prepared communications SBYV-100 4 x 2 x 0.5 onsite port cable Mapping between cable connectors for CAN communications ports  Connecting cables to the PDU for a 1+1 UPS2000-G-15 kVA/20 kVA parallel system (Three-phase input single-phase output and One Mains Input) MBS is short for maintenance bypass switch.
  • Page 18 Connecting cables to the PDU for a 1+1 UPS2000-G-15 kVA/20 kVA parallel system (Three-phase input single-phase output and Two Mains Input)  Torque for tightening power cables Device Tool Screw Torque UPS2000-G-15 kVA M5 x 0.8p 1.5 N· m UPS2000-G-20 kVA M5 x 0.8p 1.5 N·...
  • Page 19: Power-On Procedure

    Item Appearance Specifications Remarks Maintenance Prepared onsite bypass port RVV 4 x 0.5 (connectors cable provided) communications SBYV-100 4 x 2 x 0.5 Prepared onsite port cable Mapping between cable connectors for CAN communications ports  Connecting cables to the PDU for a 1+1 UPS2000-G-15 kVA/20 kVA parallel system (Three-phase input single-phase output and Two Mains Input) MBS is short for maintenance bypass switch.
  • Page 20 Appendix Maintenance bypass usage PDU front view 1. UPS 1 mains input 2. UPS 2 mains input circuit 3. UPS 1 bypass input circuit 4. UPS 2 bypass input circuit breaker breaker breaker circuit breaker 5. UPS 1 output circuit 6.
  • Page 21 HUAWEI TECHNOLOGIES CO., LTD. Huawei Industrial Base Bantian Longgang Shenzhen 518129 People’s Republic of China www.huawei.com...