Paddleboard Installation; Figure 32: Example Of 86498-94 Paddleboard With Two Quad-Port Modules - GE JungleMUX SONET Technical Practice

Table of Contents

Advertisement

Paddleboard Installation

For correct operation, the 087-86430-90 subassembly (JVT/DS0 channel
bus extender) must not be installed underneath nor on either side of the
1. Place the 86498-94 paddleboard (consisting of three paddleboard levels
attached to each other) onto the designated slot positions ensuring that the
rear connectors are fully mated.
paddleboard prior to insertion.
2. Install one (or two) quad-port modules onto the 86498-94 paddleboard Banks
A and/or B, as required. Note that Bank A can accommodate only 86418-6X
modules while Bank B can accommodate only 86498-95 module.
3. Secure the quad-port modules along with the 86498-94 paddleboard in
position using fixing screws provided. Note that all four screws must be in
place even if only one quad-port module is installed.
Figure 32 is an example showing an 86498-94 paddleboard with two quad-port
modules installed. The paddleboard is shown with SFP transceivers installed for
ports 1, 2, G1 and G2 and with no fixing screws in place.

Figure 32: Example of 86498-94 paddleboard with two quad-port modules

Copyright  GE Multilin Inc. 2010-2012
WARNING
86498-94 paddleboard assembly.
Ensure the correct orientation of the
342-86400-498PS
Issue 1.2
April 2012
Page 60

Advertisement

Table of Contents
loading

This manual is also suitable for:

86498 ether-1000 unit

Table of Contents