Toro 30284 Service Manual page 205

Floating deck mid-size
Hide thumbs Also See for 30284:
Table of Contents

Advertisement

LINKAGE
20. With the right control lever in the operating position,
there should be .10" (2.5mm) gap between the OPC
switch plunger and the control arm tab. Adjust the
switch location as needed (Fig. 0672).
4
21. Install the spring onto the right hand motion control
lever assembly (Fig. 0673).
4-98
Fig 0672
PICT-2104
Fig 0673
PICT-2071
22. Insert the upper end of the control linkage rod into
the tab on the control handle (Fig. 0674).
Fig 0674
23. Slide a washer onto the upper end of the control
linkage rod (Fig. 0675).
Fig 0675
Floating Deck Mid-Size Service Manual
PICT-2066
PICT-2065

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents