Visually checking the magnesium anode and cleaning the storage
tank
▶ Close the shut-off valves and isolate the immersion heater (if used)
from the mains power supply.
▶ Drain DHW cylinder ( Chapter "Decommissioning").
▶ Remove the storage tank cover.
0010015346-01
0010015346-01
Fig. 67 Removing the storage tank cover
▶ Remove the access port with magnesium anode.
Fig. 68 Removing the handhole cover
▶ Check the magnesium anode and install a new one if necessary.
▶ Replace the magnesium anode if the diameter is less than 15 mm.
▶ Check the transfer resistance between the protective conductor
connection and the magnesium anode.
▶ Reseal the magnesium anode.
TSS – 6720887693 (2018/10)
▶ Hose down the inside of the DHW cylinder.
Fig. 69 Hosing down the inside of the storage tank
▶ Use a wet/dry vacuum to remove any residue.
If an immersion heater is installed:
▶ When installing, turn the handhole cover until the immersion heater
is pointing downwards.
Fig. 70 Immersion heater pointing downwards
Hand-tighten the hexagon bolts on the handhole cover. Then retighten
with a ¾ turn.
▶ Close the inspection aperture.
▶ Re-commission the DHW cylinder.
0010015449-01
Maintenance, Inspection
0010016347-01
0010015997-01
27

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Tss150-2e/fcc-2Tss200-2e/fcc-2Tss300-2e/fcc-2

Table of Contents