Making Checks after Completion of Installation Work
Take back the following parts which are no longer necessary:
[1]Cover of the Buffer Pass Unit
[2]Power cord
[3]Binding-head screw(M4x10)
Operation Checks
1) After completion of installation, connect the power plug of the host machin and equipment to the power
outlet. Then open the switch cover and turn ON the main power switch.
2) In the operation check mode, check for cover sheet insertion operation
6
Installation > Installation Procedure > Operation Checks
2pcs.
2pcs.(230Vmodel)
1pce.
6
Installation > Installation Procedure > Operation Checks
6-15
6-15