6. OPERATIONS

6.1 Procedures for Preparing and Running

Make preparations and perform operations, that is, density measurements, in accordance with the
following procedure.
Verifying the piping
Verifying the valve closure
Verifying the cable connection
Verifying the converter power-ON & display
Warm-up
Verifying and setting measurement
conditions
Filling up the density meter pipe with drinking
water (density 0%)
Zero calibration
Pour the fluid to be measured
Span calibration
Startup
See 6.2(1)
See 6.2(2)
See 6.2(3)
See 6.3.1(1)
See 6.3.1(2)
See 6.3.2(1) and (2)
See 6.4(2) to (10)
See 6.4(11) to (15)
See 6.5
Refer to 6.6, 6.7
See 6.6