Commissioning; General Information For Commissioning; Checking The Oil Level Prior To Commissioning - Siemens BA 2030 SERIES Operating Instructions Manual

Gearbox
Table of Contents

Advertisement

Commissioning

5.1

General information for commissioning

Unintentional starting of the drive unit
Secure the drive unit to prevent it from being started up unintentionally.
Attach a warning notice to the start switch.
Risk of slipping on oil
Remove any oil spillage immediately with an oil-binding agent in compliance with
environmental requirements.
Checking the pressure breather valve
Check that the breather valve is activated.
If the breather valve has a transport fixture, it must be removed before commissioning.
Figure 5-1
Remove the transport fixture by pulling the securing clip
5.2

Checking the oil level prior to commissioning

Check the oil level before commissioning. Correct the oil quantity when required. Please
observe Checking and changing lubricants (Page 67).
Siemens AG recommends a complete oil change after a storage time longer than 24 months:
● For gearboxes with long-term preservation.
● For gearboxes supplied completely filled with oil.
Please observe Checking and changing lubricants (Page 67).
BA 2030
Operating Instructions, 11/2017, A5E37880173A/RS-AE
WARNING
WARNING
Pressure breather valve with securing clip
in the direction of the arrow.
5
51

Advertisement

Table of Contents
loading

Table of Contents