Installation; Unpacking; General Information On Installation - Siemens BA 2030 SERIES Operating Instructions Manual

Gearbox
Table of Contents

Advertisement

Installation

4.1

Unpacking

NOTICE
Transport damage impairs the correct function of the gearbox
Never commission faulty gearboxes.
Check the gearbox for completeness and for damage. Report any missing parts or damage
immediately.
Remove and dispose of the packaging material and transport equipment in compliance with
regulations.
4.2

General information on installation

Operating under load
Under load, the system can start or reverse in an uncontrolled fashion.
The entire system must be load-free so that there is no danger during this work.
NOTICE
Destruction caused by welding
Welding destroys the geared parts and bearings.
Do not weld on the gearbox. The gearbox must not be used as a grounding point for
welding operations.
BA 2030
Operating Instructions, 11/2017, A5E37880173A/RS-AE
ATEX version gearboxes
Effect on bearings of stray electric currents from electrical equipment.
When mounting the gearbox on or connecting it to the machine, take care to
ensure potential equalization. The information on grounding and equipotential
bonding provided by the motor supplier must be observed.
WARNING
4
25