HP 12500 Series Configuration Manual page 120

Mpls, routing switch series
Table of Contents

Advertisement

IngressLsrID
LocalLspID
Tunnel-Interface
Fec
Nexthop
In-Label
Out-Label
In-Interface
Out-Interface
LspIndex
Tunnel ID
LsrType
Bypass In Use
BypassTunnel
Mpls-Mtu
Verify the FRR function.
6.
# Shut down the protected outgoing interface on PLR.
[SwitchB] interface vlan-interface 2
[SwitchB-Vlan-interface2] shutdown
%Sep
7 08:53:34 2004 SwitchB IFNET/5/UPDOWN:Line protocol on the interface
Vlan-interface2 turns into DOWN state
Perform the display interface tunnel 4 command on Switch A to identify the state of the primary LSP.
You can see that the tunnel interface is still up.
Perform the display mpls te tunnel-interface command on Switch A to verify the configuration of
the tunnel interface.
[SwitchA] display mpls te tunnel-interface
Tunnel Name
Tunnel Desc
Tunnel State Desc
Tunnel Attributes
LSP ID
Session ID
Admin State
Ingress LSR ID
Signaling Prot
Class Type
Reserved BW
Setup Priority
Affinity Prop/Mask
Explicit Path Name
Tie-Breaking Policy :
Metric Type
Record Route
FRR Flag
BackUpBW Type
Route Pinning
Retry Limit
Reopt
:
2.2.2.2
:
1
:
Tunnel5
:
3.3.3.3/32
:
3.2.1.2
:
NULL
:
1024
:
----------
:
Vlan-interface4
:
4098
:
0x22002
:
Ingress
:
Not Exists
:
Tunnel Index[---]
:
1500
: Tunnel4
: Tunnel4 Interface
: Modifying CR-LSP is setting up
:
:
1.1.1.1:1
:
10
:
UP
:
1.1.1.1
:
RSVP
:
CT0
:
0 kbps
:
7
:
0x0/0x0
:
pri-path
None
:
None
:
Enabled
:
Enabled
:
-
:
Disabled
:
10
:
Disabled
112
Oper State
:
UP
Egress LSR ID:
4.4.4.4
Resv Style
:
SE
Tunnel BW
:
0 kbps
Hold Priority:
7
Record Label :
Enabled
BackUpBW Flag:
Not Supported
BackUpBW
:
-
Retry Interval:
10 sec
Reopt Freq
:
-

Advertisement

Table of Contents
loading

Table of Contents