GE D90 Plus Instruction Manual page 284

Line distance protection system
Hide thumbs Also See for D90 Plus:
Table of Contents

Advertisement

GROUPED PROTECTION ELEMENTS
Breaker failure initiation stage
Determination of a breaker failure condition
274
Figure 237: Breaker failure current supervision reset time
A FlexLogic™ operand representing the protection trip signal initially sent to the breaker
must be selected to initiate the scheme, except if this is already programmed as a trip
output (the protection trip signal does not include other breaker commands that are not
indicative of a fault in the protected zone). The initiating signal should be sealed-in if
primary fault detection can reset before the breaker failure timers have finished timing.
The seal-in is supervised by current level, so it is reset when the fault is cleared. If desired,
an incomplete sequence seal-in reset can be implemented by using the initiating operand
to also initiate a FlexLogic™ timer, set longer than any breaker failure timer, whose output
operand is selected to block the breaker failure scheme.
Schemes can be initiated either directly or with current level supervision. It is particularly
important in any application to decide if a current-supervised initiate is to be used. The use
of a current-supervised initiate results in the breaker failure element not being initiated for
a breaker that has very little or no current flowing through it, which may be the case for
transformer faults. For those situations where it is required to maintain breaker fail
coverage for fault levels below the
setting, a current supervised initiate should not be used. This feature should be
Pickup
utilized for those situations where coordinating margins may be reduced when high speed
reclosing is used. Thus, if this choice is made, fault levels must always be above the
supervision pickup levels for dependable operation of the breaker fail scheme. This can
also occur in breaker-and-a-half or ring bus configurations where the first breaker closes
into a fault; the protection trips and attempts to initiate breaker failure for the second
breaker, which is in the process of closing, but does not yet have current flowing through it.
When the scheme is initiated, it immediately sends a trip signal to the breaker initially
signaled to trip (this feature is usually described as re-trip). This reduces the possibility of
widespread tripping that results from a declaration of a failed breaker.
The schemes determine a breaker failure condition via three paths. Each of these paths is
equipped with a time delay, after which a failed breaker is declared and trip signals are
sent to all breakers required to clear the zone. The delayed paths are associated with
breaker failure timers 1, 2, and 3, which are intended to have delays increasing with
increasing timer numbers. These delayed paths are individually enabled to allow for
maximum flexibility.
Phase Current Supv Pickup
PLUS
D90
LINE DISTANCE PROTECTION SYSTEM – INSTRUCTION MANUAL
CHAPTER 7: PROTECTION
or the
Neutral Current Supv

Advertisement

Table of Contents
loading

Table of Contents