Checking the throttle cable and shift
cable
1. Check that the operation of the throttle
cable and shift cable.
2. Check the inner wire, outer wire of the
throttle cable and shift cable. Replace if
the outer wire is bent or damaged and
the rubber seals are damaged.
Assembling the tiller handle
1. Install the throttle shaft 1 into the tiller
handle 2 so that the pin 3 of the throttle
shaft 1 aligned with the mating surface
of the tiller handle 2 in horizontal posi-
tion.
2
A
1
2
2. Insert the throttle cable 4 into the gear
5 until the inner cable is engaged with
the gear.
3. Turn the throttle shaft 1 clockwise to
wind the inner cable around the gear 5.
4. Tighten the nut 6.
61U5H11
3
3
61U70470
4
6
Lock nut 6:
11 N·m (1.1 kgf·m, 8.1 ft·lb)
5. Install the bushing 7, spring 8, throttle
grip 9 and cover 0 into the tiller handle
2.
2
7
8
9
A
Lubricating the throttle gear
1. Inject grease into the grease nipple until
grease comes out from the screw hole
a.
A
a
Tiller handle
5
1
2
61U70480
3
4
5
0
A
6
61U70490
7
8
9
69D70170
7-4