Download Print this page

Motorola AP-5181 Deployment Manual page 27

Hide thumbs Also See for AP-5181:

Advertisement

Deployment Guide
6. Press the gasket into place on the plastic face with light finger pressure. Make sure the cutout of the
gasket aligns with the shape of the connector pocket of the flange barrel.
7. Slide the flange barrel so the modular connector is fully seated into the connector pocket.
8. Depress the modular connector latch spring against the body of the connector to fit the connector into the
pocket.
9. Insert the connector into the LAN or WAN port of the AP-5181. The connector will only plug into the port
if the connector is properly orientated. Using only finger pressure, no tools.
27

Advertisement

loading