Download Print this page

Motorola AP-5181 Deployment Manual page 11

Hide thumbs Also See for AP-5181:

Advertisement

Deployment Guide
Heavy Weather Kit Assembly
To install the AP-5181 heavy weather kit:
NOTE
1. Install 4 antenna extension cables (provided in the kit) to the AP-5181. Hand tighten.
2. Route the antenna extension cables through the cable guides on the rear of the access point. The cables
cross from left to right to maximize the bend radius. Avoid any sharp bending of the cables to extend their
useful life.
Motorola Solutions recommends the assembly of the AP-5181 heavy weather kit be
started, and fully staged, before the unit is moved into the field for deployment.
11

Advertisement

loading