Toro Groundsmaster 300 Series Service Manual page 263

Hide thumbs Also See for Groundsmaster 300 Series:
Table of Contents

Advertisement

22. Insert the LARGE tang of the drive link into the slot
in the rotor (Fig. 85).
IMPORTANT: An incorrect (reversed) assembly of
the drive link will prevent the assembly of the hex
drive.
23. Grasp the drive link and rotate the metering package
by hand to make sure the parts do not bind (Fig. 86).
The rotor should orbit inside the stator. If they bind,
disassemble the metering package, correct the cause
and repeat the assembly and concentricity procedures.
24. Apply clean multi-purpose grease to the metering
ring seal ring. Put the seal ring into position in the
metering ring seal groove opposite to the end with the
alignment pin holes. Stack the metering ring into place,
over the four bolts, with the seal ring towards the upper
cover plate. Make sure an alignment pin hole on the
metering ring is in line with and on the same side as the
alignment groove on the side of the upper cover plate
(Fig. 87). This is required so the other components can
be aligned correctly.
IMPORTANT: Make sure the seal ring does not slip
from position.
®
Groundsmaster
300 Series
Page 8 - 43
Figure 85
Figure 86
Figure 87
Repairs

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents