Chapter 2 - Pre-Installation - Toshiba Strata AirLink Installation Manual

Digital business telephone systems
Hide thumbs Also See for Strata AirLink:
Table of Contents

Advertisement

Pre-installation
This chapter provides common step-by-step pre-installation procedures and several sample
configurations for both Strata AirLink Wireless systems. The configurations range from a single
system with one or two Base Stations to multiple-overlapping systems. The anticipated coverage
of 320,000 square feet per Base Station and a maximum number of 32 users for each system was
used to layout the samples.
It is highly recommended that a site survey and BER test be conducted to assist in the careful
planning of Base Station placement, ensuring the highest possible quality of coverage. The survey
should include:
o
Location of Base Stations
o
Maximum broadcast range required from any Base Station
o
High traffic areas and general coverage areas, such as conference rooms, cafeterias, and
manufacturing floors
o
Obstructions between Base Stations and handsets
o
Office locations and number of handsets within each location
o
Construction materials used in walls, including the insulation, and floors between multistory
buildings
o
Window coatings and coverings
o
Large metal objects, such as equipment, doors, and fluorescent lamp shades
Distance of Base Stations from the BSIA or RWIU
o
There are special installation requirements to meet Underwriters Laboratories (UL) 1459
regulations in the United States that are explained in the
Page
102.
Strata AirLink Installation Guide
5/00
"Underwriters Laboratories (UL)"
2
on
5

Advertisement

Table of Contents
loading

Table of Contents