Programme Sequence Indicators; At The End Of A Programme - Miele G 7881 Operating Instructions Manual

Washer-disinfector
Table of Contents

Advertisement

Operation
During a programme, you can switch
between the following displays:
– the current temperature,
– the elapsed programme duration and
– the active wash block:
1 = Pre-wash 1
2 = Pre-wash 2
3 = Main wash 1
4 = Main wash 2
5 = Chemical disinfection *
6 = Rinse 1
7 = Rinse 2
8 = Rinse 3
9 = Rinse 4
10 = Final rinse 1
11 = Final rinse 2
13 = Drying
^ Press ß to switch between the
displays.
Programme sequence
indicators
The indicator light for the active
programme stage lights up during the
programme.
k
Reactivation
I
Pre-wash 1 + 2
l Main wash 1 + 2 *
H
Rinse 1 - 4 / Final rinse 1 + 2
c Drying
r End of programme
(Programme parameters have
been reached)
32
* Rinse block 5 (normally for chemical
disinfection) can be programmed in as
an extra stage in freely programmable
Programme A. It is then not possible to
dispense chemical disinfection agents.
The programme sequence indicator l
will light up when Rinse block 5 is
active.

At the end of a programme

The programme has ended when r
lights up constantly in the programme
sequence display and the 6 indicator
has gone out. A 0 will appear in the
middle of the display. All the other
indicators come on and go out in
sequence.
At the same time a buzzer sounds for a
maximum of 30 seconds (default
setting).
The buzzer can be changed, see
"Programmable functions".
Use the ß button to call up the total
running time of a programme or the
current temperature.
Immediately the programme finishes,
partially open the door of the machine
(by about 10 cm) for 10 to 15 mins.
Only then unload the machine. A good
drying result is achieved in the residual
heat, which should help to prevent the
instruments corroding.

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents