GE 225 Installation Manual page 33

Digital energy 225 and 300 kva / series 0 uninterruptible power supply
Table of Contents

Advertisement

g
JB1
JB
JA1
JA
1
2
3
4
Control bus cables routing
Place and fix the cables JA-1/2/3/4/5/6/7 and JB-1/2/3/4/5/6/7 inside the UPS cabinets in the
position illustrated in the drawing.
Pay attention when cabling and routing the bus cables JA and JB inside the
UPS cabinet.
In case one unit should be removed from the parallel system, the bus cables
JA and JB must be removed from the cabinet without disconnecting them
from the metal plate where the sockets JA and JB are located.
For reliability reasons the cables JA-1/2/3/4/5/6/7 and JB-1/2/3/4/5/6/7 connecting the units
should be run in separated protected conduits (as indicated in fig. 3.11-3) separated from the
power cables.
It is important that the cable JA must be the same length as cable JB.
The connection of the control bus cable in a UPS system already powered
requires a special reset operation, which can be made by only a trained
operator.
OPM_SGS_ISG_M22_M30_0US_V011.doc
JB1
JB2
JA1
JA2
JA
Q1
Q2
1
JB1
2
3
4
JA1
Fig. 3.11-3 Control Bus cable routing and connection
33/38
JB
Q1
Q2
1
2
3
1
4
2
3
4
JA2
Installation Guide SG Series 225 & 300 kVA