g
3.8.4 Battery connection
1
2
3
4
+
Positive pole of the Battery
Do not insert the Battery Fuses before the commissioning.
Battery Cable Terminations are to the Positive and Negative Terminals as shown above.
Connect wire to the Lugs using appropriate tools and appropriate torque.
Torque specification for Input/Output and DC power connections on Bus Bars: See section 3.8.1.
OPM_SGS_ISG_M22_M30_0US_V011.doc
Q1
Q2
1
2
3
4
Fig. 3.8.4-1 Power connections Battery
Battery
27/38
BATTERY
_
PE
+
–
Negative pole of the Battery
Installation Guide SG Series 225 & 300 kVA
GE