Contacting Support Website Support ain Website Main Website dell.com support.dell.com Support Website Dell Documentation support.dell.com/manuals W-ClearPass 500 Hardware Installation Guide...
1. Safety Notice and Warnings FCC Notice This device complies with part 15 of the FCC Rules. Operation is subject to the following two conditions: 1. This device may not cause harmful interference. 2. This device must accept any interference received, including interference that may cause undesired operation.
3. Electrical and General Safety Guidelines CAUTION This appliance is intended for installation in restricted areas only. Initial setup and maintenance should be performed by qualified personnel. CAUTION Power down the appliance following the operating system’s proper power down procedure from the front panel.
Page 6
3. Electrical and General Safety Guidelines (continued) WARNING Disconnect the power supply at the circuit breaker before accessing any components. Turning off the system power supply switch does not reduce the risk of electrical shock from the power supply terminal block.
4. Site Preparation Setup location, rack and appliance precautions • Elevated Operating Ambient Temperature - If installed in a closed or multi-unit rack assembly, the operating ambient temperature of the rack environment may be greater than room ambient temperature. Therefore, consideration should be given to installing the equipment in an environment compatible with the maximum ambient temperature (Tma) specified by the manufacturer.
Page 8
5. Unpacking the 4-Post Rack Installation Assemblies Before you begin verify the ship kit includes one of the following installation assemblies: • One power cord • Installation hardware (shown below) • The 4-post and/or 2-post rack rail and bracket assemblies 4-POST RACK INSTALLATION HARDWARE 2-POST RACK INSTALLATION HARDWARE Eight (8) M5 x 12...
6A. 4-Post Rack Installation Unpack the appliance and locate the mounting hardware Step 1 • Remove the inner fixed chassis rails from the outer fixed chassis rails. • Pull each one out as far as possible. • Depress the locking tab to pull the inner rail completely out. •...
6B. 2-Post Rack Installation Unpack the appliance and locate the mounting hardware Step 1 • Remove the inner fixed chassis rails from the outer fixed chassis rails. • Pull each one out as far as possible. • Depress the locking tab to pull the inner rail completely out. •...
7. Rail Installation on the Appliance Locate the fixed chassis rails that were put aside in 6A or 6B, Step 1 on pages 8 or 9. • Mount the inner fixed chassis rails to each side of the appliance using three M4 x 4 truss head screws on the left and right sides as shown.
9. Rear Panel Connections • Step 1: Connect the power cord. CAUTION • Step 2: Connect the Ethernet cables. Slide rail/mounted equipment is not to be used as a shelf or a work space. • Step 3: Connect any other required cables. 10.