Huawei DBS3900 Installation Manual page 233

Hide thumbs Also See for DBS3900:
Table of Contents

Advertisement

DBS3900 (Ver.B)
Installation Guide
Before a DBS3900 starts operating, you must check the power-on status of the cabinet and
components in it.
8.8 Subsequent Operations
You must perform subsequent operations after installing a base station and checking related
hardware installation.
Issue 06 (2011-09-15)
8 Outdoor Scenario with DC Power Supply (BBU Installed
Huawei Proprietary and Confidential
Copyright © Huawei Technologies Co., Ltd.
in a +24 V DC APM30H)
220

Advertisement

Table of Contents
loading

Table of Contents