Step 2 Install a monitoring signal cable between the BBU in the APM30H and the CMUA in the
TMC11H, as shown in
1.
2.
Step 3 If one more APM30H is configured, connect one end of the monitoring signal cable between
the BBU in the APM30H and the CMUA in the extended APM30H to the MON1 port on the
Issue 06 (2011-09-15)
Figure 6-111 Installing a monitoring signal cable between the CMUA and the BBU in an
APM30H
Figure
Connect one end of the monitoring signal cable between the BBU in the APM30H and the
CMUA in the TMC11H to the COM_IN port on the CMUA.
Connect the other end to the MON0 port on the UPEU in the BBU.
Figure 6-112 Installing a monitoring signal cable between the BBU in the APM30H and
the CMUA in the TMC11H
Huawei Proprietary and Confidential
Copyright © Huawei Technologies Co., Ltd.
6 Outdoor Scenario with AC Power Supply (BBU Installed
6-112.
in an APM30H)
116

Advertisement

Table of Contents
loading

Table of Contents